Two down and 15 to go. That is the status of our 2011 sand bunker renovation project of the back nine bunkers. We started with the fairway and greenside bunker on #10 and also the two leftside greenside bunkers on #11.
Watering of the sand once it is installed in the bunker is the key to getting it initially packed. The better it is packed the first time the better and longer it will perform properly. Bill has already wet and packed this bunker twice with the sand pro.
No comments:
Post a Comment