Monday, December 19, 2016

Farewell 2016...You Will Not Be Forgotten

As we say goodbye to another golfing season at Harrison Bay I wanted to take a quick look back at the 2016 season.  This summer marked my 25th summer on a golf course and my 16th at The Bear Trace.  Although I consider myself a pretty decent superintendent I have to admit that this summer definitely educated, and humbled me more than any other year I can remember in my career.

In preparation for this season the agronomy staff worked hard during the winter months to make improvements to the golf course.  The biggest projects were the renovation of #3 green  and the extensive drainage project in the landing area of #10 fairway.  We also worked on some bunker renovation, irrigation improvements, and improving drainage along cart paths.  With all these improvements we felt pretty good about the upcoming season as dormancy broke and the growing season began.

#2 Green on April 19 under attack from nematodes
Unfortunately our season got off to a terrible start with a massive nematode infestation that devastated many large areas on our greens.  The original diagnosis of our problem was a root pathogen which was attacking the root system, which was accurate, but this disease was really only allowed to attack the greens root system because the nematodes had weakened the roots to the point that they could not defend themselves or recover quick enough.  As the greens continued to come out of dormancy the nematodes continued to feast on the fresh, new, susceptible young roots that our bermudagrass greens produce each spring.

Putting green Nov 2 recovered from nematode damage
After receiving the results of a soil assay that showed sting and root knot nematode counts drastically elevated we were convinced that the primary concern was not to combat the root pathogen but rather the microscopic nematodes that were reeking havoc on our greens.  After several application of products to reduce the nematode population and provide protection for the root system the greens began to recover.  Over the summer the agronomy staff worked hard to repair areas on the greens that were damaged from the nematode attack including the complete renovation of #9 green.  It has been an long battle by I am proud to say that our greens are back to their championship form that we have been known for for so many years.

After an exciting week hosting the TGA Match Play Championships at the end of July the agronomy staff jumped right back into improving the golf course.  Our aerification of the golf course this August was the most extensive we have undertaken since we renovated the greens back in 2003.  Removal of major amounts of thatch and organic matter from greens, tees, fairways, and the driving range made a tremendous improvement in the course.
All of the activities cataloged in posts about 2016 Greens Aerification and Showing the tees, fairways, and driving range some love.

The fall was a definite reminder that every year is different from the next.  The hottest, driest summer that I can remember that gripped the southeast was unprecedented with Chattanooga breaking long standing records with a total of 108 days with temperatures over 90 degrees and over 7 months without receiving a total of 1" of rainfall in a single day.  This was the first summer I can remember of having to place supplemental irrigation sprinklers around the course just to save wilting 419 bermudagrass.

On the environmental front we welcomed the latest two eaglets HB9 and HB10 to the HBEC family and unfortunately said goodbye to Eloise as we got a new female eagle at our nest, which Hannah named Eliza.  We are currently experiencing some technical issues with the main PTZ camera and sound resulting from the storms a couple of weeks ago but hope to have this resolved in time to watch the next brood of HBEC eaglets enter the world.

Barry supervising Mitch's work in the mini-ex.

The golf course lost two very good employees this year.  Barry Webb passed away unexpectedly on May 29th.  Barry was one of those guys who never complained, always showed up to work, and did his best for the course.  RIP Barry.

We also said goodbye to my first assistant Mitch Sivley. After 17 years of dedicated service to the golf course he left to follow his dream of being a truck driver.  Mitch was a cornerstone of our course and I relied on him greatly throughout the years.  His skill on heavy equipment and with a chainsaw will be missed as will his dedication and passion for the golf course itself.

Outreach, education, and accolades continued this year beginning in January at the 50th annual TTA conference where I received the Dr. Tom Samples Professional of the Year Award.  At the Golf Industry Show in San Diego we were honored by Golf Industry Magazine for our social media presence and outreach with the Dr. John Kaminski Award.  I was fortunate to be able to present our environmental projects and programs to several organizations including the New England Regional Turfgrass Council, Sustainability in Golf, and most recently at the 2016 Carolinas Golf Course Superintendent Association Conference and Tradeshow in Myrtle Beach.

After a long summer we are eagerly looking forward to the dawn of 2017.  This year I have realized that even after 25 years in the business I still have much to learn and that I can not let my guard down at any time of the year.

The agronomy staff deserves all the credit for the turn around in the conditioning of the golf course this year and I am grateful for their continued dedication to the course.

From frustration to elation, from failure to victory, from questioning my future in the industry to remembering why I really love my career.

Farewell 2016...You have been an interesting year and one we will not forget.

Sunday, June 12, 2016

Best Laid Plans Gone Awry---Green #9

Not every plan that we come up with at the golf course works out the way we plan, but you have to be willing to try different techniques or you will never know.  When we came out of winter dormancy this year we were dealing with several issues and had to try different techniques to combat them.  On #9 green our issue was not nematodes as it was on the other greens but rather poor drainage and an excessive amount of surface algae that was smothering the new turfgrass as it was trying to come out.

We tried several chemical controls to try and eliminate the algae growth but none of them worked the way we needed so we decided we would "wash" the algae off with a high pressure hose.  We started with a 1" adjustable fire hose nozzle but that was not working as well as I wanted so I decided to use a flat fan nozzle on the end of the 1" hose to peel the algae off of the green.

In theory the plan worked great and there was lots of green grass on the green under all that algae.  So our plan worked out, correct?  Well, not really.

On other areas that had algae growing on them on other greens we reverted back to the less aggressive adjustable nozzle after we realized that the flat fan nozzle had actually, almost irreparably, damaged the green by stripping the leaf blades off of the plant.  After a week or so after performing the high pressure washing of the green I knew our best laid plans had gone awry.  The green was showing some signs of recovery but with the golf season coming on quick we had to make some quick decisions about how to fix or repair this green.

Before just fixing the green we needed to figure out what could have been the cause of the issue in the first place.  Why was the green failing to drain properly and allowing the surface to stay wet for so long to allow the algae to become such a problem.  At first we thought it was our pigment PAR from Harrell's that we used for greens applications but according to lab testing that was not the cause of the sealing off of the greens.  A closer look at the top three inches of our greens surface and the topdressing sand we have been using for several years began to tell the tale about what happened.  The fine and very fine sand particles in our topdressing sand exceeds the suggested limits for topdressing sand from the USGA.  These particles had packed together to make water and air almost impossible to penetrate the green surface.  Below the top 2 inches tests showed that our greens were functioning properly but the water simply could not make it through to that level rapidly enough.

With several big events coming up at the end of the summer we had to pull the trigger on fixing the green.  We simply could not wait for the green to come back in on its own.  So on Monday, May 23rd, we started the renovation process of the green by removing the top 3-4 inches of the green surface as we did on #3 green over the winter months Rebirth of #3 Green  The removed material was stockpiled in the parking lot to be used in other projects at a later date.

Close to 75 tons of new greens mix was brought to the green and spread.  We used the tracks of the Bobcat track loader to disturb the area beneath the 4" so that there was no chance of the two sands bridging or water being trapped between the new sand and the existing greens complex.

After the green was roughed in and then fine hand raked to level out any humps we watered down the sand to help it pack better and used the weight and the tracks of the track loader to firm up the greens surface and get it ready for it's new coat of turf.

The removal of the damaged green and the replacement of the new greens mix was done by Mitch and Bill in only one day.

Over the next couple of days we continued to hand rake and pack the new greens mix as well as apply our pre plant fertilizer getting the surface ready to lay the new Champion Ultradwarf bermudagrass sod on it.  The sod arrived on Wednesday and early on Thursday morning we got started by first placing a ring of sod around the perimeter of the green and then pulling a rope across the middle of the green so we could have a good first line and off we went.

It took the agronomy staff a little over 4 hours to cover and cut in the new sod on the green.  Roll after roll after roll we kept laying it down until it was all done.  The sod came in a refrigerated trailer so it was still in excellent condition and gave us an instant idea of what the green would soon look like once it was grown in.

Once the green was completely covered and cut in we cleaned up all the scrap pieces and moved all the unused pallets of sod out of the way and began the "seating in" process.  First we hand watered the green rather heavily to water the sod and to make the 1.25 ton vibratory roller work better.  We rolled the sod in multiple directions which did a great job of helping to level everything out.

After the multiple rollings we had a sand slinging party to add greens mix on the surface and used level lawns and brooms to help work it down into the canopy.  This helped to firm up the green and level off high and low areas in the green.

The next thing on the list, after multiple heavy waterings, was to mow the green at a high height of cut 0.250" taking off the top bit of canopy to help the smoothing process and to make it easier to get the multiple topdressings into the surface.

Unfortunately this is the last project, and last picture I took, of one of our agronomy staff members Barry Webb.  Barry passed away unexpectedly on Memorial Day.  Rest in peace Barry.  You are very much missed.

So it has been three weeks since we went from what was an embarrassing situation and green to one that is looking extremely good.  Already down to greens height and rolling better and better every day we are extremely happy with the results of the project.  Thanks to all the golfers who put up with the temporary green in the fairway for a few days and with the slower than normal putting as we worked the green down to height.  As we move forward the green will only get better as the rest of the greens are.

The Agronomy Staff did a great job on this project and we will continue to work to improve the golf course with other projects such as sodding, tee and approach aerification, and adding sand to bunkers will be carried out throughout the remainder of the summer.

Sunday, June 5, 2016

Greens Update -- Getting Better Every Day

Photo taken on April 19, 2016
It's only the first of June but it has already been a long season for the agronomy team at Harrison Bay, mostly due to the extended growing season we encountered this past winter where we were still mowing green turf on our greens on New Year's Eve day which is very unusual. If you have played the course you have witnessed the areas on the greens which are less than ideal.  So what caused this and what are we doing to correct it?

The primary cause of our issues on the greens was a severe infestation of nematodes, mostly of the Sting (Belonolaimus longicaudatus) variety.  Nematodes are microscopic, non-segmented worms which feed on the root system of plants in various ways, all leading to the injury and/or demise of the turfgrass.  In the case of the Sting nematode they feed by inserting a stylet into the plant root much like a mosquito into a human and suck out the plant juices.  By the time the symptoms are observed on the surface the damage has been done below.  We normally treat for nematodes from March through October but with the warm weather this winter the nematodes did not enter dormancy, or hibernation, as they usually do.  This was an abnormal year and I simply was not thinking of nematode control during the Christmas season.  This has been a wake up call for us and we will, from now on, be on a 12 month preventative control program for these little pests.

Photo taken on May 21, 2016
All is not lost however.  We have seen a considerable amount of recovery over the past couple of weeks since the weather has improved with higher temperatures which has greatly encouraged both topical and root growth.  The nematode infestation has been controlled with the use of Avid from Syngenta and Nortica from BAYER Golf.  We have begun using a new product Dakota REV from Dakota Peat which we have seen considerable benefits from.  This product along with our foliar apps from Harrell's MaxLine and our granular fertility, along with Harrell's Divot Recovery Mix, will help to continue to improve the putting surfaces every day as we move forward.

Unfortunately there are areas on a couple of greens which would take longer than acceptable to recover just by growing in the turf that is there so we will be working to repair these areas with sod over the next several weeks.  No one likes to have to sod a green surface but this is the best and quickest way to get these areas, mostly on the perimeter of the green and thus not affecting most putts, back into proper condition and ready for the major golfing tournaments and TGA state championship events we have coming up in the next three months.

Healthy turfgrass from root to tip can withstand more environmental stresses than plants which are already weak.  This is well known and commonsense.  So as I stated last year in Time to Reset we will be doing more cultural practices on the greens to help improve their health and ability to withstand the pressures placed on them from weather, play, maintenance practices, disease pressures, and other forces such as nematode activity.  This may include additional venting and quad tine core aerifications, spiking, shallow and deep verticutting of greens, and additional applications of sand topdressings.  All designed to improve the health of our greens by revigorating our 12 year old Champion greens with new, stronger, healthier plants.

We are confident that our greens will continue to improve exponentially as the summer progresses and we thank all of our faithful members and tournament directors who have stuck with us through this learning process.  This has been a trying time for everyone at the course as golfers look to us for answers as to what went wrong.  I have to thank my agronomy staff for their hard work and the operations staff in the clubhouse for taking the brunt of the questions and concerns.  As it has been said before "If it was easy, everyone would do it." which is definetely true for a golf course superintendent.  We are excited about the future and thank you for your patience.






Saturday, March 12, 2016

The Rebirth of #3 Green

For several year now we have been dealing with the poor performance of #3 green.  We have tried many different practices and processes to try and revive this green but with no success.  So this winter we took on a renovation of this green in order to continue to work to provide the best possible playing conditions and experience we can.  Details of the project and why we chose to make this drastic step can be viewed on a previous blog post, Renovation of #3 Green.

We began the project in November by removing the top 5 inches of the contaminated greens mix. The excess organic matter in the greens surface made it virtually impossible for the green to perform properly.  It was surprising how fresh the greens mix below this level was.  Like it had just been installed a few days ago.  This difference in the two layers validates the need, and our request, for deeper aerification of the greens surfaces to eliminate this hard pan layer and allow for roots, water, and air to penetrate deeper into the greens profile.

The next step was to bring in new greens mix which was spread and contoured to a new greens shape.  The new greens mix and the old greens mix was lightly blended together to insure we did not have a barrier between the two soils.  The green was then graded and packed which gave it a similar but new look to the surface and now provides us with about twice the legal pinning areas as before.

Once the green was packed and contoured we installed new Champion ultradwarf bermudagrass sod to the surface.  Now sodding an ultradwarf green in the middle of winter in Tennessee is not the ideal way of doing things I will agree but it was the only time we could do this project and affect the smallest amount of play.  We were extremely lucky during the time of the sodding as we had unusually warm weather through the end of December which allowed us to roll and top dress the green several times and helped in its transplanting.

On February 27th we decided to officially open #3 green for play.  Although there are still a few seams that you can see and it is not as smooth or fast as the other greens on the course, playing on the greens surface is better than playing on the temporary green out in the fairway.  We will continue to roll and top dress the green over the remainder of the month and believe by the end of March the green will be as good as the rest of them, maybe even better.

We are very pleased with the results of this project and very encouraged by the growth we are seeing from the green given how early it is in the season and the weather we have had so far.  This is a picture of a plug taken from #3 green and as you can see the roots are starting to grow and establish into the greens mix.  This is a very encouraging sign and one we are very happy to see.

I would like to thank our Agronomy Staff for all their hard work on this project.  We took on a challenge that many people said we were crazy to attempt and through hard work and determination have succeeded in reviving our worst green to one we can now be very proud of.  I would also like to thank everyone, from the proshop to the golfers, for their patience and understanding as we carried out this process.  I know it was not ideal to have to play to a temporary green for three months but I believe you will agree with me that the pain was worth the gain.

As always we will continue to strive everyday to make The Bear Trace at Harrison Bay the best that we possibly can and we thank you for your patronage and your support.  If you have any questions or comments please don't hesitate to contact me with them.

Saturday, December 19, 2015

Facelift for #16 Green

This week we worked on giving #16 green and little facelift and in the process correcting poor surface drainage on the back of the green that has caused weak turf on the cleanup lap.  As you can see in the photo there was a dip where the 419 surround and the Champion green surface met resulting in water running down the 419 surround and then sitting on the edge of the green.  This caused for poor rooting and surface algae accumulation which caused for poor turfgrass coverage.

We removed the existing turf, both Champion and 419, and also removed any greens mix that was contaminated with excessive organic matter. We brought in new greens mix and spread across the area.

Once the new greens mix was spread out we used a 1 ton roller to pack the new mix and make sure we had the proper grade that we wanted for the area to help ensure the water did not have an area to accumulate in but continued on the green.

After the sod was placed on the ground it was watered and rolled multiple times to smooth it out and help ensure good sod to soil contact.  This was a good way to make sure we had the proper slope that we wanted and had a good transition from the existing sod to the new sod.

Once the sod was down, watered, and rolled into place it was lightly topdressed and watered in several, several times to fill in the canopy and help retain moisture.

Improvements will continue at Harrison Bay all winter, especially if we continue to have this great warm weather.  Any area, on or around any of the greens, that has been renovated will be marked and should be considered Ground Under Repair and should be played as such.

Thanks to Willie, Barry, and Mitch for doing such a great job on this project.  Now onto the next one.

Saturday, December 12, 2015

Renovation of #3 Green

As with everything in life, greens, whether it be the turf covering the surface or the sand supporting the surface or the drain lines underneath the surface, have a life span.  Over the past several years #3 green has suffered from its poor growing environment and other factors to be a less than acceptable putting surface.  We have tried many different life support practices and have patched weak areas for years but the green still continued to go down hill and it was time for some exploratory and reconstructive surgery.

The issues that lead to the demise of #3 green compared to the other greens begins with its location.  Being located down in the "hole" as it is and surrounded by trees limits the amount of air movement to the green.  This lack of air movement along with the poor sunlight the green receives throughout the year restricts how quickly and well the green drains.  The excess moisture in the green complex has lead to anaerobic activity, leading to poor root development, increased disease pressure, weak canopy production, and the creation of surface algae.  Through the years we have tried many cultural practices to correct these issues, including aerification, DryJecting, and patching of the green.  None have been successful to bring the green back to where it needs to be.

So last week we began the renovation of the green by removing the top 4-5 inches of the green surface.  It took all day and a couple of changes in the process for the crew to get all the "bad soil" removed and stockpiled at the top of the hill for use in a later project.

The next step was to bring in 125 tons of new 85:15 greens mix from Golf Agronomics.  The new mix was spread and floated out across the green.  We were able to successfully disturb the top 2-3 inches of the existing greens complex by using the tracks of the Bobcat to fluff up the sand which I feel allowed for the new greens mix to blend with the existing green so we will not have a layer barrier and thus did not need to till the two layers together.

Once all the greens mix was added we spent some considerable time floating the sand out and moving it around inch by inch to ensure that once the grass was added to the surface we had created a fun and playable putting surface.  The contours of the green were changed significantly to give us more movement throughout the green, better surface drainage of the green, and increased our pinnable locations.  I think you will really like the subtle, but interesting, changes we made to the surface.

Renovating an ultradwarf bermudagrass green is definitely not something you would consider to be a winter project as warm season grasses need summer temperatures to grow but we are in a situation where closure of this green during the summer months was not an option, but this way we will enter next year with a newly grassed green.  The sod was delivered from Champion Turf Farms on Wednesday morning.  It took Thursday and Friday to install the 6,500 sq ft of sod.  I had forgotten how challenging laying small rolls of sod on a green could be but thanks to our dedicated agronomy staff we got it done, and done well.

Once the sod was down we rolled the green to smooth out the surface and ensure good sod to soil contact.  Willie is using a one ton roller to smooth out the green. You can see in the video how well the roller works.

The last step in finishing up the greens sod installation process was to use a Toro Hydorject 3000.  The Hydroject uses high pressure bursts of water, which you can hear in the video, which help to turn the roots of the grass toward the new soil.  This is probably the best method to smooth out a newly sodded area and help establish new roots.


It has surely been a process and a lot of work by our staff but the final product is one that we are very happy with.  There are still many steps to go, such as fertilizing, topdressing, more rolling and hydrojecting, and so forth.  By the spring we will have the greens surface ready for play and will hopefully not have to field the one question that I hated to hear, "What's up with #3 green?"

We thank you for all your patience and understanding as we continue to work to improve the golf course for your enjoyment.

Saturday, November 14, 2015

Winter Projects for 2015-2016

Well the rumor mill is pretty active right now about what all we have on tap for this winter when it comes to course improvements.  As you may have noticed the parking lot has some new features being stockpiled in it which will be disappearing over the next couple of months.

The most important project is the renovation of #3 green.  We will begin this project on Monday the 23rd and it should take us a couple of weeks to complete if the weather cooperates.  We will move the pin to the top of the ridge in the fairway near the fairway bunker and play this hole as a par 3 while the green is being worked on and healing in.  We will be overly protective of this green this winter so I will not set a timetable for when it will reopen.  It could possibly be covered when other greens are not if the temperatures dictate it.

So what are we doing and why.  We will be removing the top 4-5 inches of the greens mix and replacing it with the new greens mix located in the parking lot.  The green will then be sodded using Champion Ultradwarf bermudagrass.  We will be rolling, hydorjecting, and topdressing the green throughout the winter months to prepare it for the spring. The work is being done to remove the excessive organic layer and various sand layers in the top of the soil profile which continues to restrict water and oxygen movement and producing the unhealthy turfgrass which we now have.

We have tried to modify the soil profile with standard core aerification, DryJect sand injection aerification, and many other ways not to have to take on this disruptive process but each year the green continues to get worse and it is time to rip off the band-aid and fix the problem.  I apologize for this minor inconvenience but the green will be much better moving forward and worth all the temporary pain.

Our biggest project which will take a couple of months to complete will be the installation of close to 5,000 linear feet of drainage pipe in the landing area on #10 fairway.  This area has struggled for the past several years due to lack of sun and poor infiltration and surface drainage.  We began correcting the issue this summer with the removal of select shade producing trees along the right side of the area.  This is one step but since the area has little to any surface slope we will need to install subsurface drain lines to remove the water and create a suitable surface for play.  The drain lines will start near the 150 yard marker and will continue every 10 feet toward the green moving across the fairway to a large collection pipe which will move the water to the lake.  We know this landing area has been a point of contention for many golfers this year and like our other projects we are going to fix it instead of patching it.  While we are working on this hole all tees will be moved to a teeing area about 100 yards from the green making this another par 3 for the winter.

Our other project that we will hopefully get to this winter is the continued installation of used railroad cross ties along the cart paths to eliminate erosion, direct water flow to surface drains, and to encourage golfers not to drive their golf carts in areas where they are not supposed to.  This will be third on our list and will most likely be carried out more toward the spring than during the winter months.

We will do everything in our power to not interfere with your round while we are making these much needed improvements to the course.  We trust that you will see the benefit shortly as we continue to work to make the course the best it can be.